Sydenham Hill Estate Weekly Works Update: w/c Monday 28 October 2024

Dear Neighbour,

 

Please find below the activities that are scheduled to take place from the week commencing Monday 28 October 2024 in connection with the Sydenham Hill Estate Redevelopment Project.

Monday 28 October - Friday 1 November

Block A

  • Brickwork to 2nd floor & main entrance atrium and columns between blocks A & B

  • Internal walls

  • Mechanical & electrical installation - 1st & 2nd floor

  • Testing of mechanical pipework, 1st floor

  • External boarding & windows – 3rd floor

  • Scaffold adaptation for brickwork

  • Roof waterproofing works to gutter

  • Pitched roof tiling

Block B

  • Scaffolding installation to perimeter

  • Perimeter brickwork, ground floor

  • Internal blockwork to ground floor

  • External boarding 3rd floor

  • Windows & balcony doors, 1st floor

  • Electrical installation to generator room

  • Installation of remaining stacks through the building

Block C

  • Brickwork to lower ground floor

  • High level mechanical & electrical services, lower ground floor

  • Floor screed, 1st - 2nd floor

  • Internal walls 2nd floor

  • Pitch roof covering & waterproofing

Otto Close

  • External brickworks, plots 8-11

  • Scaffolding,plots 1-7

  • Floor joist installation, plots 1-4

  • Steel delivery

Saturday 2 November (08.00 – 13.00)

  • Continuation of works listed above

 

Noisy works

  • Plant movement (excavators and dumpers)

Deliveries

  • Muck removal lorries in and out of main gate

  • Concrete lorries in and out of the delivery gate

  • Steel delivery to Otto Close. The road will be partially blocked whilst this is offloaded. This is expected to take 2-3 hours and we will move the delivery vehicle out of the way when required to allow traffic through.

Note/Future works

  • Safety notice: Please ensure that all traffic signs and barriers aimed at passing pedestrians are observed at all times. Marshalls are on site monitoring all construction traffic, and we request that you follow their instructions, particularly if you are with children, for your and their own safety.

  • Recycling/Rubbish collection, Otto Close: We have been informed that recycling bin collections have been missed which could be due to construction lorries blocking the road.  Please note that the Lovell traffic marshalls will bring down the bins should the collection not take place before 8am and can also help with emptying the bins if required.   

  • Naming ballot please remember to vote on your choice for the new name of the residential building. Link to ballot here

If you have any queries, please contact us on info@sydenhamhillproject.com

 

General Site Working Hours:

Monday to Friday 08:00 to 18:00

Saturday 08:00 to 13:00

For site emergencies, please contact:

Andrew Neary             07436 049 480

Hannah Morgan          07769 306 933

Hamid Vafaeifard 07587 103 467

Dion King                     07901 737 269

Laury Jancauskas 07502 600 834

Best Wishes,

The Sydenham Hill Project Team